Commercial Buildouts &Tenant Finish-Outs inCorpus Christi
Restaurant conversions, tenant finish-outs, and ADA-compliant commercial restrooms — the same finish-level work, scaled up for your business and scheduled around your opening date.
- Licensed & Insured
- Permits Handled
- ADA Compliant
- Scheduled Around Your Opening
- Since 2013
Work that opens doors
Every Week Past Your Opening Date Is Rent on an Empty Room
A commercial job runs on more than good carpentry. It runs on a schedule you can plan a lease around, permits pulled correctly the first time, inspections that pass without a re-visit, and a crew that doesn't leave your space full of debris the week you're supposed to open.
That last part sounds like a detail. It isn't. If you've signed a lease, you're paying rent from the day the term starts — not from the day you open the doors. A buildout that runs three weeks long isn't a scheduling inconvenience; it's three weeks of rent, payroll you've already hired for, and a marketing push aimed at an opening date that came and went.
The real cost of a commercial contractor is almost never the bid. It's the overrun.
And overruns on commercial work come from two places, both predictable.
The permit path.
On most commercial buildouts, permitting and inspections — not construction — are the critical path. A submittal that goes back for corrections costs weeks. On a restaurant you're often coordinating building permits alongside health department review, and if those sequences aren't managed together from the start, you wait.
Subcontractor scheduling.
Every trade handed to a different company is another calendar you don't control. When the framer finishes Thursday and the electrician can't start until the following Wednesday, that's five days nobody is accountable for.
MLA has run this crew since 2013 across restaurant buildouts, brand conversions, tenant finish-outs, and commercial restrooms built to code. Six trades in-house — carpentry, tile, plumbing, painting, concrete, and finish work — means dramatically fewer schedule dependencies. Nobody's waiting on somebody else's sub to free up, because there aren't any.
“Very professional and competent… I did not have to constantly monitor the status of my projects… you wouldn't even know a repair had been made.”

What You Get
A Partner Who Gets It Open
Restaurant Buildouts
Full interior buildouts — framing, bars, counters, seating areas, finishes, restrooms, and the plumbing and gas rough-in behind all of it. Electrical is coordinated with a licensed electrician.
Brand Conversions
Converting one restaurant concept into another on a franchise timeline, working to the brand's specifications and image standards.
Tenant Finish-Outs
Taking a cold shell or a previous tenant's space to a finished, inspected, occupiable space that matches your landlord's work letter and your own operating needs.
Commercial Restrooms
Some of our steadiest work. Full-height tile, partitions, wall-mounted fixtures, and ADA-compliant layouts — clearances, grab bars, fixture heights, and lavatory knee clearance done to code, not approximated.
Permits Handled
Licensed contractor pulling city permits and coordinating inspections, managed as part of the schedule rather than handed to you as homework.
Scheduled Around You
Work phased around your operating hours where the scope allows, and built to your opening date where it doesn't.
How It Works
Four Steps, Built Around Your Business
On-Site Walkthrough
Juan walks the space with you — your landlord's requirements, your equipment list, your operating needs, and your opening date.
Scope, Permits & Schedule
Written scope, firm price, permit filings, and a schedule tied to your date. If the date isn't achievable, you hear it here, before you sign anything.
We Build It
One crew, phased in the right order, site kept clean and safe throughout — which matters more on an occupied property than most contractors act like it does.
Final Walkthrough & Inspection
Punch list walked with you, inspections passed, space handed over ready to open.
What It Costs
Every Commercial Project Is Scoped and Priced Up Front
Commercial work varies too much to quote sight unseen, and anyone who gives you a number over the phone is guessing with your lease. Three things drive it:
The size and type of space
A 1,200 square foot retail finish-out and a full restaurant conversion are different orders of magnitude, even at similar square footage, because of what has to go into the walls and the floor.
What the buildout requires
Plumbing and gas rough-in, electrical service and panel capacity, grease interceptors, hood and make-up air provisions, walk-in coolers, and ADA restrooms each add real scope. A space previously built for a similar use is far cheaper to convert than one that wasn't.
Permits and timeline
The permit path shapes both the cost and the calendar, and a compressed timeline costs more because it means overtime and stacked trades. We'll tell you that plainly rather than quietly bidding it and hoping.
Real Jobs, Real Spaces
A Look at Commercial Work
Every photo below is an actual MLA Contracting commercial project in the Corpus Christi area. No stock images, no borrowed portfolios.
Good Questions
Commercial Work, Answered
Restaurant buildouts, conversions from one restaurant brand to another, tenant finish-outs for retail and office space, and commercial restrooms. We work throughout Corpus Christi and the surrounding Coastal Bend, including Portland, Robstown, Ingleside, and Aransas Pass.
Yes. For an operating business, we phase the work and schedule the disruptive parts — demo, concrete cutting, anything loud or dusty — around your hours wherever the scope allows. For a space that isn't open yet, we build straight through to your opening date. Either way, the plan is set before we start, not improvised weekly.
Yes. MLA is a licensed contractor that pulls city permits regularly and coordinates inspections. On most commercial jobs the permit path is the critical path — it determines when construction can actually start and when you can occupy — so we manage it as part of the project rather than handing it back to you.
We do, and commercial restrooms are some of our steadiest work. That means proper maneuvering clearances, compliant door approach and hardware, correct grab bar placement and mounting heights, fixture heights, lavatory knee and toe clearance, and accessible controls. These are measured requirements, not judgment calls, and getting them wrong is a failed inspection at best.
Too variable to quote sight unseen. Juan walks the space, scopes it against your equipment list, your landlord's work letter, and your timeline, then gives you a written number before anything starts.
It depends on the current schedule and, more often, the permit path. Call with your opening date and Juan will tell you honestly whether it's achievable — ideally before you sign the lease, because that's the moment the information is actually worth something.
Yes, on tenant finish-outs and on repairs and improvements across managed properties. We're used to working to a work letter and to a landlord's requirements around insurance, hours, and building access.
Restaurant buildouts carry scope that retail and office space don't — grease interceptors, hood and make-up air provisions, floor drains, sanitary wall and floor finishes, and gas sized for the cooking line. They also typically require health department review alongside the building permit. We scope these at the walkthrough rather than discovering them at inspection.
Related Services
Related Services
Local Service Areas
Where We Provide This Service
MLA Contracting delivers this service across Corpus Christi and surrounding Coastal Bend communities.
Free On-Site Walkthrough
Let's Get Your Space Open
Call Juan at (361) 244-6440 or send your details and opening date. He'll walk the space with you and tell you straight what's achievable.