Kitchen Remodeling in Corpus Christi — MLA Contracting in Corpus Christi, TX

Kitchen Remodeling · Corpus Christi & the Coastal Bend

Kitchen Remodelingin CorpusChristi

New cabinets, stone counters, tile, and a layout that finally works the way you actually cook. One local crew handles all of it — from the first measurement to the last cabinet handle.

  • Licensed & Insured
  • Se Habla Español
  • Estimates 7 Days a Week
  • Since 2013

More trades than any room in the house

A Kitchen Is Six Jobs Pretending to Be One

A kitchen remodel touches more trades than any other room you'll ever renovate. Demo, framing, electrical, plumbing, cabinetry, countertop templating, tile, and finish carpentry all have to happen in a specific order, and each one depends on the last being right.

That's where most kitchen remodels in Corpus Christi go wrong — and it's almost never a craftsmanship problem. It's a coordination problem.

The electrician roughs in outlets before anyone confirms the final cabinet layout, so now there's a receptacle behind a pantry wall. The countertop gets templated before the cabinets are shimmed level, so the stone has a gap at the back wall. The tile guy shows up on a Thursday when the backsplash can't go in until the counters are set, so he leaves and you don't see him for two weeks.

Every one of those is a handoff failure. And handoff failures happen because most contractors this size are really brokers — they win the job and then subcontract every trade in it.

MLA doesn't work that way.

Juan Martinez has run this crew since 2013, and the crew covers carpentry, tile, plumbing, painting, concrete, and finish work in-house. The people who measured your kitchen are the people who build it. There's no schedule to coordinate between five companies, because there's one company.

What that means in practice: you get a straight scope and a firm written price before a single cabinet comes out. The work runs in order instead of in fits and starts. The site gets swept before the crew leaves each day. And when it's finished, we walk the entire kitchen with you — every drawer, every door, every outlet — before anyone calls it done.

“Ten projects were completed as expected with excellent craftmanship. Everyone was polite, professional, and honest. Far surpassed my expectations… I will certainly hire them again.”

— Kimberly B. · HomeAdvisor
Kitchen Remodeling work by MLA Contracting

What's Included

Everything the Kitchen Needs, Under One Roof

A full kitchen remodel has a lot of moving parts. Here's what MLA handles so you're not managing separate trades yourself.

Cabinets & Layout

New cabinet runs, islands, peninsulas, and pantry builds. If the floor plan is the problem — a wall closing the kitchen off from the living room, a work triangle that makes you cross the room to get from sink to stove — we can change it, not just reface what's there.

Counters & Stone

Granite, quartz, and natural stone, templated after the cabinets are set and leveled so the fit is right. Sinks cut in, faucets and disposals plumbed, edge profiles chosen at the estimate.

Tile & Backsplash

Travertine, subway, mosaic, tile medallions, and pot-filler surrounds. Tile is the work this crew is best known for, and a backsplash is where a kitchen either looks built or looks assembled.

Finish Carpentry

Crown molding, light rail, toe kicks, cabinet end panels, floating shelves, and trim. The detail work that separates a $20,000 kitchen from a $12,000 one, and the part most crews rush.

Plumbing & Gas

Sink and disposal plumbing, pot-filler lines, and gas runs for a range conversion. In-house and licensed — not subbed out.

Paint & Cleanup

Walls, ceilings, and trim finished, and the site cleaned and put back before we leave. Not left in your dining room for the weekend.

How It Works

Four Steps, No Guesswork

01

Call or Text

Tell us what's going on. We'll ask the right questions and set a time to look at it.

02

On-Site Estimate

We come out, measure, and give you a straight number — no vague ranges.

03

We Build It

One crew, start to finish. You get daily progress and a clean job site.

04

Final Walkthrough

We walk it together. Nothing's done until you say it's done.

Remodeling on the Texas Coast

What the Gulf Does to a Kitchen

Salt air, humidity, and slab foundations change what a kitchen remodel means here. None of it is a reason not to do the job — it's a reason to do it right the first time.

The coast eats finishes faster than people who move here expect. Hinges, knob screws, and the small hardware inside a cabinet corrode faster in salt air than inland, and a hinge that seizes will twist a door out of alignment before it ever fails outright. Exterior-facing walls and any wall with plumbing are the worst, because they cycle between humid and dry.

On hardware and fixtures.It's worth choosing solid brass or stainless hardware over plated zinc for anything you'd rather not replace, and specifying a faucet and fixtures rated for the climate rather than the cheapest option. These are selection decisions, not construction ones — but they're the kind of decision that's expensive to undo after the counters are set.

On paint.Interior paint near the coast fails at the trim and the ceiling before it fails on the walls, because that's where humid air condenses on cooler surfaces. A proper primer, a washable finish, and venting the kitchen when you cook all matter more here than they do inland. The paint itself is the easy part; the prep is what decides how long it lasts.

Ventilation matters more here.A range hood that actually moves air — vented to the outside, not just recirculated — pulls moisture and cooking grease out before they settle on cabinets and walls. In a humid climate that's not a luxury; it's what keeps a new kitchen from feeling old in a year. If the existing ducting is undersized or unducted, it's worth fixing during the remodel rather than after.

Slab foundations and moving plumbing.Most homes in Corpus Christi are slab-on-grade, which means the drain lines and a good deal of the supply plumbing run under the concrete. Moving a sink across the room, or relocating a range that needs a gas line, can mean cutting the slab, trenching the new drain, and re-pouring the floor — and the tile or flooring on top of it. It's doable, and we do it, but it's a real cost and it has to be in the plan from the estimate, not discovered mid-demo.

What we find behind the walls.The age of the housing stock tells us a lot. In the older neighborhoods — Central City, Del Mar, Six Points, Ocean Drive, older Flour Bluff — opening a kitchen wall frequently turns up original wiring that's due for an update and cast-iron drain lines at the end of their life. On the Southside and in Calallen, the 1970s–90s stock is more often slab plumbing ready for attention. None of it is a disaster; it's the reason we look before we quote, and tell you the day we find it if something's there.

Permits.Anything that changes electrical, plumbing, or gas, or touches structure, generally needs a permit from the City of Corpus Christi — and that's the work we handle, including the inspection. A purely cosmetic job like a cabinet-door swap usually doesn't need one. Pulling the permit means the work is on the record, which matters when you sell, and it means an inspector signs off rather than you taking our word for it.

What It Costs

Kitchen Remodels Begin at $5,000

MLA takes on full kitchen remodels rather than quick patch jobs. That minimum keeps the crew on fewer homes at a time, so your finish work gets the hours it actually needs instead of being squeezed between four other jobs. Beyond that floor, three things set the number — and Juan walks all three with you at the estimate.

01

The size and layout of the kitchen

Cost follows linear feet of cabinet and counter more than square footage of floor. A compact galley and an open-concept kitchen with a ten-foot island are different jobs, even in houses the same size. Changing the layout — moving the sink, relocating the range, taking out a wall — adds plumbing, electrical, and sometimes framing to the scope, and that's a real cost, not a markup.

02

The materials you choose

This is the biggest swing in the entire budget, and it's the part you control. Stock cabinets versus semi-custom versus custom. Plywood boxes versus particleboard. Granite versus quartz versus a mid-grade laminate. A straightforward subway backsplash versus a travertine medallion behind the range. Two kitchens with identical footprints can differ enormously based on nothing but selections.

03

What's behind the walls

This is where Corpus Christi housing stock matters. In the mid-century homes around Central City, Del Mar, and Ocean Drive, opening a kitchen wall frequently turns up original wiring that needs updating and cast-iron drain lines at the end of their service life. In 1970s–90s Southside houses, it's usually slab plumbing that's ready for attention. We look for all of it at the estimate rather than finding it on day three — and if something does turn up, you hear about it immediately, with what it changes, before we keep going.

How It Actually Goes

The Sequence, and a Realistic Timeline

A kitchen remodel runs in an order, and each step depends on the last one being right. Here's what that actually looks like, and why the schedule moves the way it does.

The order of work.Estimate and selections first. Then demo. Then rough-in — plumbing and electrical relocated or updated while the walls are open. Then drywall and paint. Cabinets set and leveled. Countertop templated off the installed cabinets, then fabricated and set. Tile and backsplash after the counters are in. Fixtures and finish carpentry last, then a punch walk where we go over it together. Nothing about the order is optional — tile before counters means the stone doesn't fit, and rough-in before the layout is final means outlets land behind walls.

What drives the timeline.Custom and semi-custom cabinets are usually the longest single lead item, which is why we order them early — often before demo, so the cabinet lead time runs in parallel with the rough work instead of after it. A cabinet-and-counter refresh in the existing footprint is the fastest path through. Every layout change — moving the sink, taking out a wall, adding an island — adds steps in front of the finish work, and that's time as well as cost.

We give you a realistic timeline alongside the written scope, and the same crew stays on the job from start to finish instead of disappearing for two weeks in the middle. If something behind a wall changes the schedule, you hear about it that day, with what it changes, before we keep going.

Cabinet choices.Stock, semi-custom, and custom are three different price points and three different timelines. Stock cabinets are fastest and least flexible; semi-custom gives you sizes and finishes without paying for full custom; custom is built to the room and is the slowest and the most expensive. Plywood versus particleboard boxes, and the type of hinge and drawer glide, are where two cabinets that look the same differ in how long they last — and it's worth choosing before, not after.

Countertop tradeoffs.Granite, quartz, and natural stone each trade off differently. Granite needs sealing and is heat-tolerant; quartz is lower maintenance and consistent but isn't fond of a hot pan straight off the burner; natural stone is one of a kind and the most to maintain. The edge profile, the number of seams, and how the sink mounts all change the fabrication. None of it is right or wrong — it's what fits how you actually cook and how much maintenance you want to live with.

Real Kitchens, Real Homes

Kitchen Remodels We've Built in Corpus Christi

Every photo below is an actual MLA Contracting kitchen in the Corpus Christi area. No stock images, no borrowed portfolios.

Kitchen Remodel Questions

Answers Before You Call

Kitchen projects with MLA begin at $5,000, and the final number follows three things: the size and layout of the kitchen, the cabinets and stone you choose, and whatever has to change behind the walls. Material selection drives more of the total than anything else — the same kitchen can swing dramatically on cabinet grade and countertop choice alone. Rather than guess over the phone, Juan comes out, measures, and gives you a firm price in writing so you know the number before any work starts.

It depends entirely on scope. A cabinet-and-counter refresh moves considerably faster than a remodel that changes the layout or relocates plumbing. Custom cabinet orders are usually the longest lead item and often set the schedule before demo even begins — which is why we order early. Once we've walked your kitchen, you get a realistic timeline alongside the written scope, and one crew stays on it start to finish instead of disappearing for two weeks in the middle.

Usually, yes — anything involving electrical changes, plumbing relocations, gas lines, or structural work generally requires a City of Corpus Christi permit. Purely cosmetic work like replacing cabinet doors typically doesn't. MLA is licensed and pulls permits as part of the job, so the filing and inspection side is handled rather than left on your plate. It also means the work is on the record, which matters when you sell.

Most homeowners do. The kitchen itself is out of commission while we work, so plan on a temporary setup — a microwave and coffee maker somewhere else in the house goes a long way. We keep the rest of the home clean and contained, and we tell you ahead of the most disruptive days so you can plan around them.

Either way works. We can source cabinets, stone, and tile for you, or install materials you've already selected. We go over options at the estimate so the choices fit both the look you want and the budget you have — and we'll tell you honestly if something you've picked is going to cause problems to install or to live with.

Often, yes. The first question is whether the wall is load-bearing, which determines whether you need a properly sized header and, depending on the span, an engineer's sign-off. We figure that out at the estimate, not mid-demo. Because the same crew handles framing, plumbing, drywall, and finish carpentry — and coordinates the electrical with a licensed electrician — opening a wall is one job with one schedule instead of five contractors taking turns.

We handle it. Plumbing is part of what MLA does, so relocating a sink, running a gas line for a new range, and pot-filler lines are all part of the same job, the same schedule, and the same phone number. Electrical work is handled by a licensed electrician we coordinate with when a kitchen remodel requires it.

It does, and it's worth knowing before you pick hardware and finishes. Hinges, knob screws, and small cabinet hardware corrode faster in salt air than inland, and a hinge that seizes will twist a door out of alignment before it fails outright. Solid brass or stainless hardware holds up better than plated zinc, and fixtures rated for a coastal climate outlast the cheapest options. These are selection decisions, not construction ones — but they're expensive to undo after the counters are set.

Most Corpus Christi homes are slab-on-grade, so the drain lines and a good deal of the supply plumbing run under the concrete. Moving a sink across the room, or relocating a range that needs a gas line, can mean cutting the slab, trenching the new drain, and re-pouring the floor — plus the tile or flooring on top of it. It's doable and we do it, but it's a real cost that has to be in the plan from the estimate, not something discovered mid-demo.

Estimate and selections, then demo, then rough-in (plumbing and electrical while the walls are open), then drywall and paint, then cabinets set and leveled, then countertop templated off the installed cabinets and set, then tile and backsplash, then fixtures and finish carpentry, then a punch walk. Custom and semi-custom cabinets are usually the longest lead item, which is why we order them early so the lead time runs in parallel with the rough work. A cabinet-and-counter refresh in the existing footprint is the fastest path; every layout change adds steps and time. You get a realistic timeline with the written scope, and the same crew stays on it start to finish.

Neither is strictly better; they trade off. Granite needs periodic sealing and tolerates a hot pan; quartz is lower maintenance and consistent but isn't fond of a hot pan straight off the burner; natural stone is one of a kind and the most to maintain. The edge profile, the number of seams, and how the sink mounts all change the fabrication. It comes down to how you actually cook and how much maintenance you want to live with — we walk through it at the estimate.

Local Service Areas

Where We Provide This Service

MLA Contracting delivers this service across Corpus Christi and surrounding Coastal Bend communities.

View All Areas

Free In-Person Estimate

Ready to Start on Your Kitchen?

Call or text Juan at (361) 244-6440, or send a few details and he'll set up a time. Estimates run about an hour, cost nothing, and happen seven days a week between 8am and 7pm.